Follow up report on the public consultation – Substitution of block cutting and cutting with protection of regeneration and soils for the period 2018 to 2023 Development Unit 074-51
2 September 2021
This follow-up report on the public consultation on the Substitution of block cutting and cutting with protection of regeneration and soils for the period 2018 to 2023 in Management Unit 074-51, which took place from April 17 to June 2, 2021, was produced by the Department of Forests, Wildlife and Parks.
Nous utilisons des cookies pour vous garantir la meilleure expérience sur notre site web. Si vous continuez à utiliser ce site, nous supposerons que vous en êtes satisfait.OKPolitique de confidentialité