Report of the public consultation on forestry activities in the Outaouais – November 2023
This report on the public consultation that took place from November 28 to December 23, 2023 was prepared by the MRC Pontiac.
TéléchargerArchives
This report on the public consultation that took place from November 28 to December 23, 2023 was prepared by the MRC Pontiac.
TéléchargerThe public is invited to participate in the public consultation on new potential areas of intervention under the Operational Integrated Forest Management Plans (PAFIO) 2023-2028 for the Coulonge field units (UA 071-51 and 071-52), the Basse-Lièvre (UA 072-51) and the Haute-Gatineau-et-du-Cabonga (UA 073-51, 073-52 and 074-51).
Read moreThis follow-up report on the public consultation on PAFIO, which took place from November 16 to December 11, 2022, was prepared by the Ministère des Ressources naturelles et des Forêts.
TéléchargerThis follow-up report on the public consultation of PAFIT 2023-2028 Outaouais, which took place from November 9 to December 23, 2022, was prepared by the Ministère des Ressources naturelles et des Forêts.
TéléchargerThis report on the Public Consultation that took place from November 16 to December 11 2022 was prepared by the MRC Pontiac.
TéléchargerThe public is invited to participate in the public consultation regarding potential new forest operation zones as part of the 2023-2028 Integrated Forestry Management Plans – Operational (PAFIO) for the following management units (UA): Coulonge (UA 71-51 and 71-52), Basse-Lièvre (UA 72-51) and Haute-Gatineau-et-du-Cabonga (UA 73-51, 73-52 and 74-51).
Read moreThe 2023-2028 Outaouais’s Integrated Forestry Management Plans (PAFIT) are prepared by the ‘Ministère des Ressources naturelles et des Forêts’ (MRNF) and concerns all the Outaouais’s management units: 071-51, 071-52, 072-51, 073-51, 073-52 and 074-51. The Sustainable Forest Development Act (L.R.Q., c. A-18.1) which came into force on April 1, 2013, requires that this plan be submitted to public consultation. The…
Read moreThis follow-up report to the public consultation on PAFIO, which took place from January 21 to February 15, 2022, was produced by the ‘Ministère des Forêts, de la Faune et des Parcs’.
Télécharger